realized
Address
11-B, I. Mazepa str, Kyiv
Construction period
August 2011 – December 2012
Customer
K.A.N Development
Генподрядчик
K.A.N Stroy
Works
All work was performed by construction team of “AKAM” LLC.
The AKAM materials used
-
AKAM GRAND cladding system – 66m2
-
DARK EMPERADOR marble (thickness: 20 mm, polished) – 588m2
-
CREMA MARFIL marble (thickness: 20 mm, polished) – 3115m2
-
AKAM NEW GREY UKRAINE granite (thickness: 30.140, honed, polished, aq-uastone) – 72m2