MFK «Cascade Plaza»

realized

Address

1 Ekaterinoslavskiy boulevard, Dnipro

Construction period

2008 – 2015

Customer

PAO “AGRA”

Contractor

PROMMONTAZH

Works

All work was performed by construction team of “AKAM” LLC Cladding and Glass projects were made by the project department of “AKAM” LLC

The AKAM materials used

  • AKAM GRAND cladding system - 18 089 m2
  • Dry installation system AKAM QUICK-FLOUR – more than 2000 m2
  • Granite AKAM NEW GREY UKRAINE (thickness: 20,30,50,70,100,120,150,165,180,200 mm, sawn, honed, aquastone, polished, bush-hammered) – 2 685 m2
  • Granite AKAM YELLOW (thickness: 20, 30, 100 mm, finishing: aquastone, aqua-stone+bush-hammered, polished) – 20 140 m2
  • Granite AKAM KASHMIRE WHITE (thick-ness: 20,30 mm, finishing: polished) – 1161 m2
  • Marble AKAM VERONIKA WHITE (thickness 20 mm, finishing: polished) – 10 m2
  • Fibre cement Eternit (thickness: 12mm) – 690 m2
  • HPL – panels (thickness: 6mm) – 12 m2
  • AKAM MONO GREY ceramic tiles (thick-ness: 10 mm) – 50 m2
  • “Reynaers” aluminum cladding glass system –1 938 m2
  • “Schüco” aluminum cladding glass system – 5 961 m2
  • “Warema” sun protection system – 1 382 set
AKAM, 2021