realized
Address
13-15 Bolsunovskaya Str., Kyyv.
Works
Experts of the company AKAM have carried out all scopes of works on the design and installation.
The AKAM materials used
- Granite AKAM ABSOLUTE BLACK, AKAM IRON RED METEORITE - 303 m2;
- Facade fixing system AKAM GRAND- 212 m2.